Guide OverviewChapter 1 · Solar System Basics
Chapter 1 · Solar System Basics

1.3 Essential glossary (so the sales pitch doesn't lose you)

TermAbbreviation / EnglishWhat it means
Nameplate CapacitykW (kilowatt)The system's peak instantaneous output
Annual ProductionkWh / yearCumulative energy produced per year (drives payback)
Net MeteringNEMThe rule for crediting power your system sends back to the grid
Investment Tax CreditITC§25D for residential, §48E for commercial — covered later
Power Purchase AgreementPPAA "free install" trap
LeaseLeaseAnother "free install" trap
MicroinverterOne small inverter under each panel; parallel architecture
Hybrid InverterOne central inverter handling panels, battery, and grid simultaneously — the dominant NEM 3.0 design
Self-consumption RateShare of solar energy used directly by your home (rather than exported)
Permission to OperatePTOUtility approval to energize your system
Critical Load / Backup LoadCircuits that stay alive on inverter + battery during a grid outage
Non-export / Zero ExportConfiguration where the system never pushes power back to the grid

Cross-reference: Why "annual production" stopped being the headline metric under NEM 3.0 — see Chapter 5, section 5.6.

Next Step

Questions after reading this section? Send us your utility bill — we will come back within one business day with a recommendation specific to your situation.

Call (858) 848-1819Get Quote