Guide OverviewChapter 13 · Decision Checklist
Chapter 13 · Decision Checklist

Print this and go through it before any signature

Print this and run through it before signing any contract:

  • ☐ I'm signing Cash or Loan — not PPA / Lease.
  • ☐ I have at least 3 quotes (mix of small/local and large companies).
  • $/Watt lands in the $2.5–4.5 range (with battery). Anything over $5 is probably overpriced.
  • ☐ System is sized at 1.5–2× winter usage (NEM 3.0 / NBT regions).
  • Battery capacity ≥ one full evening of base load + 4 hours of peak load.
  • ☐ Contract includes ≥ 5 years of workmanship warranty.
  • ☐ Contract explicitly lists manufacturer warranty terms and any customer-side registration requirements.
  • ☐ Contract has no mandatory arbitration / class-action waiver (or those clauses are struck out).
  • Design drawings (SLD) are part of the deliverables.
  • ☐ A 3–5 day cooling-off (Right to Cancel) period is written into the contract.
  • ☐ The installer holds the appropriate state license — C-46 / C-10 in California, or equivalent in your state.
  • ☐ I have copies of every document from the NEM submission and grant — Interconnection Approval and PTO Letter.