Guide OverviewChapter 5 · California Policy — NEM 3.0 in Depth
Chapter 5 · California Policy — NEM 3.0 in Depth

5.1 The evolution from NEM 1.0 to 2.0 to 3.0

VersionEffective periodExport creditBattery required?
NEM 1.02007–20161 kWh exported = 1 kWh credit (full retail)No
NEM 2.02016–2023.4Close to 1:1, with small non-bypassable chargesNot required (but better with one)
NEM 3.0 / NBTApril 2023 – presentSet by the ACC (Avoided Cost Calculator) — typically 1/4 to 1/8 of retailStrongly required

NEM 1.0 / 2.0 customers have 20-year grandfathering measured from the date of interconnection.

Next Step

Questions after reading this section? Send us your utility bill — we will come back within one business day with a recommendation specific to your situation.

Call (858) 848-1819Get Quote