9.5 Step 4: roof and electrical work

  • Panel install: 1–2 days (depending on roof size).
  • Electrical work (inverter / battery / panel): 1–2 days.
  • Field quality checkpoints: roof penetrations (standoffs) must hit the rafters, not just the sheathing; flashing kits must be installed correctly.