Chapter 9 · Installation Process
9.5 Step 4: roof and electrical work
- Panel install: 1–2 days (depending on roof size).
- Electrical work (inverter / battery / panel): 1–2 days.
- Field quality checkpoints: roof penetrations (standoffs) must hit the rafters, not just the sheathing; flashing kits must be installed correctly.