≡ContentsGuide Overview›Chapter 10Chapter 10Solar for ADUs and New ConstructionStart reading from section 1 →Sections in this chapter10.1.1 California requires solar on new homes10.1.2 New detached ADUs generally also require solar10.1.3 Attached ADUs, garage conversions, and JADUs generally do not require solar10.1.4 Minimum capacity for ADU / new home solar10.2 Practical notes when integrating solar into a new build← Previous9.9 Ongoing maintenanceNext →10.1 What's required for ADUs and new homes
Chapter 10Solar for ADUs and New ConstructionStart reading from section 1 →Sections in this chapter10.1.1 California requires solar on new homes10.1.2 New detached ADUs generally also require solar10.1.3 Attached ADUs, garage conversions, and JADUs generally do not require solar10.1.4 Minimum capacity for ADU / new home solar10.2 Practical notes when integrating solar into a new build