- Overall timeline
- 9.1 Step 0: assess the roof's remaining life
- 9.2 Step 1: usage analysis and system design
- 9.3 Step 2: contract review (7 must-check items)
- 9.4 Step 3: HOA approval + city permits
- 9.5 Step 4: roof and electrical work
- 9.6 Step 5: city inspection
- 9.7 Step 6: utility PTO (Permission to Operate)
- 9.8 Step 7: monitoring app setup + first-month verification
- 9.9 Ongoing maintenance